Investing today Planning for tomorrow
2022 capital Project Overview
-
Install walking paths to athletic fields +/- 500 ft
Install drainage to lower athletic fields
Restore masonary wall - auditorium (to mitigate water issue)
Install baseboard heating/duct work in band & chorus rooms
Install HVAC in main lobby area
Tennis courts - demo / complete re-build +/- 40K SF
-
Rear parking lot - demo, repave, and stripe +/- 20K SF
Rear parking lot - repair catch basin
Repair exterior masonary crack - D&E wing
Replace various exterior doors and frames
Replace rear entrance storefront system
Locker rooms - demo and entire re-build
Replace gymnasium air handling units (2 RTU's)
Replace HVAC system in locker rooms
Bathrooms - replace water supply and waste lines, fixtures, floors, walls, and ceilings
-
Parking lot and bus loops - demo, repave, stripe +/- 65K SF
Replace all classroom cabinetry / millwork
Replace all classroom ceiling tile and lighting
Bathrooms - replace water supply and waste lines, fixtures, floors, walls, and ceilings (includes 200' sewer line replacement)
Move electrical transformer from pole to concrete pad
-
Rear loading dock - enclose with roof
Rear loading dock / exterior auditorium wall - regrade / remedy ground water infiltration
Replace internal central stairway doors
Replace hand and guard rails building wide
Replace exterior egress out of the auditorium
Bathrooms - replace water supply and waste lines, fixtures, floors, walls, and ceilings
-
Repair / repoint / clean masonary brick exterior (allowance)
Replace exterior windows building-wide
Repair / replace lintels as needed (allowance)
Mitigate water infiltration on back auditorium wall
Repair terracotta scroll on front of building
Bathrooms - replace water supply and waste lines, fixtures, floors, walls, and ceilings
-
Multi-sport synthetic turf field, inclusive of the following:
~~ Site improvements:
- asphalt walkways
- perimeter fencing
- bathroom and concession concrete pads
- reconfigured drive / parking
- drainage improvements
~~ Utilities:
- LED pole lights
- electrical service connections
~~ Equipment / Amenities:
- Bleachers / pressbox (1,250 seats)
- Scoreboard
- Synthetic turf maintenance equipment
~~ 6 lane 400 meter all-weather track
building conditions survey
The master plan for all these projects stem from the Building Conditions Survey that is mandated by New York State and happens every five years. The facilities committee used this document as a guide to determine the projects most in need and what could be completed with the available funds.
Building & Grounds
In-House projects
Middle School Air Conditioning (B, C, E Wings)
District Office Roof and Gutters
District Office Asbestos Removal
District-wide Building Backflow Preventers
capital reserve fund
For all the other projects that were not included in the capital project this time around and that could not be addressed by the Building & Grounds department, the Board of Education is asking voters to establish a new capital reserve fund in order to address those items.
Some of those items include improvements to the middle school fields, middle school drop-off traffic circle, paving of Lee rd., and others.
While some of these items have been identified for the next capital project, it doesn’t mean that other necessities might not arise that supersede those already mentioned.